Site Overview & Regional Context
General-purpose maps showing the overall project boundary and its relationship to surrounding roads, rail, and landmarks.
Axis Logistics Park - Phase 1 Aerial Overview
Aerial view of the Phase 1 boundary (teal) relative to San Marcos Airport, Gary Job Corps, Reedville, Martindale, FM 110/1984, and the Union Pacific Railroad.
Phase 1 Overview - Proposed Waterline & Energy Parkway
Regional overview map labeling the proposed waterline and proposed Energy Parkway relative to San Marcos, the Blanco River, San Marcos Municipal Airport, Reedville, and Martindale.
Regional Context Map - Lettered Subarea Zones
Wider regional road map (SH-80, FM 142, FM 1977, SH-130 Toll, IH-35) with circled zones labeled F, G, M, W, V, E, O, A, X, apparently marking landowner or planning subareas near San Marcos.
Land Use, Zoning & Phasing
Exhibits from the 2023 Development Agreement and its administrative amendments governing permitted land use, project phasing, and lot configuration.
Exhibit B: Conceptual Land Use Plan
Development Agreement Exhibit B - heavy industrial / heavy commercial land use zones, floodplain, the 100' Reedville residential buffer, and the container-storage-height exclusive area.
Exhibit C: Conceptual Phasing Plan
Phase 1 / 2 / 3 boundaries, detention basins, drainage channels, and floodplain across the ±1,980-acre site. (Also featured on the homepage.)
Exhibit G: Cut-Fill Extents
Areas permitted up to 20-ft and 15-ft of cut/fill with administrative approval, and anticipated floodplain limits requiring a detailed study.
Color Exhibits - Minor Amendment
Color exhibit set attached to a minor amendment of the Development Agreement.
PDA-22-07 - Location Exhibit
Location exhibit filed with development plan amendment application PDA-22-07.
Roadway, Utility & Annexation Exhibits
Right-of-way, roadway alignment, annexation, and public infrastructure exhibits filed with the City of San Marcos.
Roadway Alignment Exhibit - Ultimate
Ultimate (build-out) roadway alignment exhibit for the site's internal and connecting road network.
Proposed Public Infrastructure Exhibit
Site-wide exhibit of proposed public infrastructure (roads, utilities) to be dedicated to the City.
Proposed Fire Station Location Exhibit
Exhibit identifying a proposed on-site or nearby fire station dedication site (Ver. 2).
AN-24-03 - Proposed Annexation Exhibit
Proposed annexation exhibit filed under case AN-24-03.
Water Quality, Drainage & Floodplain
Stormwater, detention, drainage-area, and FEMA floodplain studies - central to the site's wastewater/stormwater capacity questions covered in the Research Reports.
Detention & Water Quality Summary Exhibit
Exhibit C: Conceptual Phasing Plan, also shown on the homepage - phase boundaries, detention basins, and floodplain.
Water CCN Map
Certificate of Convenience and Necessity (CCN) service-area map for water provision to the site.
River Discharge Map
Map illustrating site stormwater discharge points relative to the San Marcos River / Blanco River system.
Blanco River Village Impact Map
Map assessing potential downstream impact to the Blanco River Village area.
Wellhead Protection Area
Wellhead protection area boundary map relevant to groundwater near the site.
Existing Water Quality Buffer Map
Existing (pre-development) water-quality buffer conditions for comparison against the proposed buffer map (Aug. 2024).
Sheet RD5.1 - Proposed Site Discharge Drainage Area Map
Kimley-Horn drainage-area map with SCS drainage-area summary tables, time-of-concentration calculations, and pre/post-detention discharge-point analysis.
Sheet RD5.2 - Overall Ultimate Drainage Area Map
Ultimate (full build-out) drainage-area map companion to RD5.1.
Sheet RD4.0 - Mass Grading Plan
Mass grading plan (Nov. 2024) showing interceptor channels, Regional Public Detention Pond "A," Culvert "A," and the Energy Parkway alignment, marked "For Construction."
Regional Wastewater Service Options Exhibit
Exhibit comparing regional wastewater service-provision options for the site (Feb. 2025) - relevant to the wastewater capacity constraint discussed in the Research Reports.
Pond Maintenance & Vegetation Exhibit
Maintenance and vegetation-management exhibit for a detention pond (Oct. 2024).
Channel Maintenance & Vegetation Plan - Phase 2
Kimley-Horn channel maintenance/vegetation plan (June 2025) for Axis Logistics Park Phase 2, with maintenance-procedure tables and Zone A/B vegetation criteria diagrams.
Storm Drain / Culvert Exhibit
Proposed 11-cell 11'x5' reinforced concrete box (RCB) culvert crossing near the Union Pacific rail corridor, with floodplain shading and drainage-flow arrows.
Floodplain / Drainage Corridor Aerial
Teal-shaded drainage/floodplain corridor running through agricultural parcels, with contour lines and parcel boundaries.
Floodplain Inundation Map - Skycrest Dr.
Close-up 100-year water-surface-elevation change (inundation) map near Skycrest Drive, part of a hydraulic model exhibit.
FEMA Floodplain / WQ Zone - Review Markup
Aerial exhibit near FM 110/FM 1984 and San Marcos Hwy 80 showing the 100-year FEMA floodplain and water-quality-zone contours, with red review markup comments requesting changes.
Environmental Contour Exhibit
Aerial imagery overlaid with a red study boundary and a green-yellow-red contour gradient near a body of water.
Water Quality Zone & Floodplain Overview
Aerial overview labeling the Water Quality Zone, Floodplain, and Property Boundary along FM 110/FM 1984 near the MKT Railroad.
Vegetative Filter Strip & Regional Detention Pond
Detail exhibit labeling the Vegetative Filter Strip, Regional Detention Pond, Water Quality Zone, and Floodplain along the proposed roadway.
Tree Preservation
FAA & Height Restrictions
Groundwater Contamination - Gary Job Corps / Municipal Landfill
Exhibits from the 1995 EPA Site Inspection Prioritization Report and the 2022 Department of Labor Draft Environmental Assessment for the Gary Job Corps Center, adjacent to the project site. See the Groundwater Contamination page for full context.
Site Area Map (1995 EPA Site Inspection, Figure 2)
Topographic map showing the Gary Job Corps Center site boundary, 1-mile radius, San Marcos Municipal Airport, and the San Marcos Municipal Landfill (hatched).
Water Well Location Map (1995 EPA Site Inspection, Figure 4)
Plots monitoring wells (MW1–MW3) and nearby drinking water wells relative to the site - the wells in which contamination was documented.
Sampling Locations Map (1995 EPA Site Inspection)
Numbered soil/groundwater sampling points and monitor wells across the site, including hatched "Area I."